Hidden Frame Curtain Wall

Hidden Frame Curtain Wall

Unlike other glass curtain wall construction, the hidden frame glass curtain wall can save the assembly of structural glass, which greatly shortens the construction period and is easier to operate.
Send Inquiry

Product Introduction


The hidden frame curtain wall is to bond the glass to the aluminum frame with silicone structural sealant (referred to as structural glue), and in most cases, no metal connectors are added. Therefore, the aluminum frame is completely hidden behind the glass, forming a large-area all-glass mirror.

 

The key tool of the hidden frame curtain wall is structural glue, which is completely word-bonded between the glass and the aluminum frame. Structural adhesive has to bear the weight of the glass, the wind load and seismic action that the glass bears, and the influence of temperature changes. Therefore, the structural adhesive is a key link in the safety of the hidden frame curtain wall.


3 


Advantages:

1.The hidden frame curtain wall has excellent seismic performance. Since the glass is bonded to the metal frame with structural adhesive, the structural adhesive has very good elasticity and can absorb vibration and deformation, so the seismic performance of the curtain wall is very superior.


2. The hidden frame curtain wall has a strong decorative effect, because its color is gorgeous, as crystal clear as a gem, the surface of the curtain wall does not expose the metal frame, and the large pieces of glass are connected together, which is very beautiful, making a building look like a crystal.


3. Material saving: The columns and beams of the hidden frame glass curtain wall are cut by the manufacturer, with high processing precision and less material waste.


4. Convenient construction: Unlike other glass curtain wall construction, the hidden frame glass curtain wall can save the assembly of structural glass, which greatly shortens the construction period and is easier to operate.

 

Installation Method

1. The glass is fixed on the sub-frame of the hidden frame curtain wall with silicone structural sealant, and the sub-frame is fixed to the main frame (post, horizontal bar) by mechanical clamping. The structural glass assembly components are completely separated from the main frame, which is one of the biggest features of the component construction of the hidden frame glass curtain wall.

2. The structural glass assembly components are produced in a professional production workshop, the quality of glue injection and processing accuracy are guaranteed, and the silicone structural sealant is saved.

3. The posts and horizontal bars are cut from the manufacturer, with high machining accuracy and less material waste.

4. The key process of making structural glass assembly components is reduced on the construction site, the construction period is shortened, and the construction equipment is reduced.

5. Columns, beams and glass plates can be installed piece by piece on site, which is easy to install and easy to adjust.

6. The construction of the hidden frame curtain wall is simple, the process flow is clear and easy to understand, and the operators are easy to master, but the professional skills and overall planning ability of managers are required to be high.

 

Glass Choice

Choose float tempered glass (coated) 6mm, 8mm, 10mm, 12mm

Choose float hollow tempered glass;

6mm+6A+6mm;

6mm+9A+6mm;

6mm+12A+6mm;

 

Low-E glass can be used according to customer needs.

Technical parameters: wind pressure resistance: <= level 3

Air permeability: <= class 3

Rainwater penetration performance: <= level 3

Air sound insulation: >= level 2

 

Insulation performance: >=6 grades


Where to use?

The high-rise buildings generally use fully hidden frame curtain wall, which will facilitate decoration. The full-hidden frame curtain wall generally looks more high-end than the frame curtain wall.

 

Process Flow

Construction preparation→measurement and lay-out→pre-embedded parts processing→connection angle code installation→column installation→beam installation→fabrication and installation of structural glass assembly components→cleaning and inspection→completion acceptance


Product Cases Show

2

1

src=http___www.facade.com.cn_upload_files_photo_60_3_20171120101149_iubik.jpg&refer=http___www.facade.com


Company Introduction

 

Foshan Ivy Building Materials Co., Ltd. is a large-scale enterprise integrating the metal and glass works. Our company is specialized in the decorative aluminum materials, aluminum doors and windows, aluminum furniture, shower enclosure, metal gate and railings . We are aiming to build a One-stop construction engineering product chain integrating efficiency manufacturing, operation and service.

 

Quality is the starting point of the value and dignity of Ivy Metal Glass.

 

Quickly meeting the market demand and fast production and delivery are the outstanding characteristics of Ivy.

 

To create value for our customers and realize our values are the mission of Ivy .



FAQ


Q: When can I expect my product to deliver?

A:Normally 30-45 days after deposit depending on your order quantity.

Q:What’s your capacity?

A:Our capacity can be 15,000 sets per month

Q: What's the favorite payment terms?

A: TT.

Q:Can we mix the container? 

A: Yes, one container can mix several models, and we also can help to load goods from other factories.

Q:How can I reach you more convenient?

A: There are two ways.

First, you can send an inquiry on the bottom of the product page.

Second, Please click the “ONLINE SERVICE” on the right of the page, and there is our salesman’s telephone number 008618520040515(same as the whatsapp)