For a detailed explanation of system door and window installation, you need to know these points
With the activation and upgrading of people's consumption power, door, and window products are closely linked to people's daily lives and are a weapon to ensure people's quality of life. As the saying goes, "Three points of doors and windows, seven points of installation", the door and window products purchased with money become particularly important in the later installation, which directly affects the decoration effect of the room and the future home life experience.
When decorating doors and windows, we should not only pay attention to the style and quality of doors and windows but also standardize the operation during installation, so that we can reduce losses when facing changeable weather. This is a basic safety guarantee measure and the key to entry and exit.
Door and window installation steps
● Preliminary preparation
1) Construction as required and draw the installation position.
2) Check whether the size meets the requirements. The number, location, and embedding method of embedded parts should be checked for holes with embedded parts. If there are any problems, they should be dealt with in time.
● Construction steps
1. Anti-corrosion treatment: Execute according to design requirements
2. Positioning and temporary fixation: According to the ink line of the door and window installation position, install the doors and windows into the opening, and the position and deviation should meet the standards.
1) The connection and fixation of the door and window frames and the wall, this project uses expansion bolts.
2) Sealing the installation gap between the door and window frames and the wall.
3) After installation and fixation, acceptance is carried out, and the sealing treatment of the installation gap between the door and window frames and the wall is carried out after the inspection is qualified.
4) The treatment of the installation gap between the door and window frames and the wall shall be carried out according to the design regulations. Cement slurry should be filled, such as leaving a sealing groove on the outdoor side, installing hardware accessories that are complete, and ensuring its flexible use.
3. Installation of door and window glass:
1) The installation of door and window sashes and door and window glass should be carried out after the surface decoration project of the opening wall is completed.
2) After the casement window is assembled on the wall and fixed, the glass is installed. First, adjust the gap, put the glass into the sash, and finally inlay the sealing strip, sealant, and anti-collision glue.
3) After the window frame of the sliding window is installed and fixed, the window sash with glass is installed as a whole, that is, the glass is inserted into the sash and sealed, and then the frame is inserted, and the gap between the frame and the sash is adjusted.
Fill with waterproof sealant.
When installing plastic door and window hardware accessories, the screws should be fixed on the inner lining reinforced steel or the inner lining partially reinforced steel plate, or the screws should pass through at least two layers of the wall thickness of the plastic profile. Aluminum alloy doors and windows should be connected and installed with matching hardware.
When installing sliding doors and windows, anti-falling measures such as adjustable limit cards must be set. The limit cards should be installed above the side of the door and window sash. After the sliding doors and windows are installed, the frame and sash should not be visually deformed, the door sash should be closed tightly, and the switch should be flexible.
The measured value of the upper and lower overlap of the window sash and frame should meet the design requirements and should not be less than 6mm. The measured value should meet the design requirements and should not be less than 8mm.
The sealing strip should have a margin for expansion and contraction, be cut at a 45-degree angle at the corner, and be firmly glued with adhesive to avoid shrinkage joints.
When installing the sliding support, stainless steel screws must be used. The steel plate should be reliably connected, and the joints should be waterproof and sealed.